So today was the big day. The distributor had completed their preparation of the components that I designed, drew and ordered. Fortunately, they were able to drill all of the holes for me and even radius-ed the edges of the fixed plates that will be welded to the gantry's legs. Thus all I needed to do was pick them up. And that I did:
![]()