Quote Originally Posted by Rambozo View Post
It is kinda arbitrary and one of the things that varies from brand to brand, so I personally don't care one way or the other. While Miller now does theirs as % NEG and Everlast does % POS it's all the same in the end. I can't say I'm a huge fan of the 50% +/- system used on the 210EXT, but it's really not an issue. Maybe if you had a shop full of different brands it might be nice to have a standard, but really it's no big deal. The early Syncrowave had a knob that went from Max Cleaning to Max Penetration with an arbitrary 1- 10 scale and number 3 was marked Balanced.

What you're saying is you would rather have something like this?

Click image for larger version. 

Name:	OneWay.jpg 
Views:	1011 
Size:	70.4 KB 
ID:	8514
Yes! That is what I would prefer if the balance control adjusts the percentage of the positive portion of the cycle.

Quote Originally Posted by Rambozo View Post
Or this?

Click image for larger version. 

Name:	AnotherWay.jpg 
Views:	1014 
Size:	70.4 KB 
ID:	8515
Yes! That is what I would prefer if the balance control adjusts the percentage of the negative portion of the cycle.

Or, if it is a +/- from 50%, I think something along this line would make more sense:

Click image for larger version. 

Name:	Graphic.jpg 
Views:	526 
Size:	3.9 KB 
ID:	8562

I really don't care where the balance is referenced from either, as long as the picture on the front matches what the adjustment actually does.

Got to looking at the pulse section a little closer too, am I the only one who notices something amiss here?

Click image for larger version. 

Name:	255extpulse.jpg 
Views:	531 
Size:	6.8 KB 
ID:	8563



Quote Originally Posted by Gwaltnak View Post
This still puts me in a precarious position... I have called and did finally receive a call back, but was told that Oleg would contact me Friday to set up shipping details. Here it is, Saturday, and no call and no details. Time is running out and I have no details. I understand Oleg is busy, but when faced with a deadline, I'd rather have things done sooner than later!
The way I read it, we only have to have things arranged before the 5th, still gives us a bit of time to get them crated and shipped. I really hope I can sneak in a couple more projects before then.