17 lpm argon flow is too much, somewhere between 8 and 11 lpm should do with an 8 to 10 cup and around 200 amps.
For material that thick, I'd bevel the edges and use a 1/8" filler rod.
Practice on some scrap of the same thickness first, with the same joint prep.
Welcome to the forum.