I think I would reconsider trying to run a sub box that has 150-200 amp capacity, and instead, run a single circuit that will cover your demand, and use a receptacle / plug for your equipment. Since you are a one man show, you won't need more than one piece of equipment at a time. It will be MUCH cheaper to run a 50-60 amp circuit than a 150-200 amp, both in the conductors, the breakers, switches, etc.
Everlast 200DX
Everlast PT185
Shoptask 3-in-1 (not currently in my garage, but I own it...)
Any day on a motorcycle like this that ends just needing parts and labor is a good day.
4.82, 158.67mph 1/8th mile 7.350, 200.35mph 1/4 mile