I would look at how well you are set up in your shop. If you can easily transition from cutting the parts, fitting, to welding, and do you have the needed tools, or enough tools to get by (which can take you longer to build something). I would add materials cost times 35% and I would calculate at 10% overage on materials just in case. Figure in shop supplies, grinding blades, saw blades, etc to do the job. Figure out how long it takes for you to weld 6 inches and try your best on time. Also I would look at the prices of pizza ovens, they are not cheap!