
Originally Posted by
Ram48
Damn Ken I wish you didn't tell me that, now I need to find a different way. I worked my entire live in electrical construction and learned to barely tolerate engineers. It should be a requirement for engineers to spend at least a year in the field installing stuff other engineers and architects come up with. Just because it looks good on paper doesn't mean it will work in the field.
I agree... 
__________________________
Everlast Power I-MIG 200
Everlast PowerUltra 205P
Everlast SM 200-N
Thermal Dynamics Cutmaster 42