Everlast Power Equipment Forum  

Go Back   Everlast Power Equipment Forum > Welding Talk > Automated welding system (CNC), Submerged ARC, etc.

Reply
 
Thread Tools Display Modes
  #1  
Old 07-26-2009, 12:11 AM
performance performance is offline
Moderator/Support
 
Join Date: Jul 2009
Posts: 731
Default Sub-Arc

For all you welders and large companies needing Sub Arc process welders, contact Everlast for special order pricing. We have the whole units including power supply, track and robot. We supply these to our interested customers. Lead time for production and delivery is approx. 3 months.
Reply With Quote
  #2  
Old 11-22-2009, 04:55 AM
BurningMetal BurningMetal is offline
Member
 
Join Date: Nov 2009
Posts: 28
Default

just imagine all the possibilites...... I could weld in my pool on a hot summer day! ....and maybe have a floating cooler full of frosty beverages nearby. lol.
Reply With Quote
  #3  
Old 11-22-2009, 12:59 PM
everlastsupport everlastsupport is offline
Everlast Support Team
 
Join Date: Jul 2009
Location: Boynton Beach, FL
Posts: 477
Default

Quote:
Originally Posted by BurningMetal View Post
just imagine all the possibilites...... I could weld in my pool on a hot summer day! ....and maybe have a floating cooler full of frosty beverages nearby. lol.
Cheaper to get one of those water cooler shirts. It was in the FABTECH video. Now that is what we need for Florida welding.
__________________
Mike R.
support@everlastwelders.com
www.everlastgenerators.com
www.everlastwelders.com
650 588 8082 x203
M-F 12 - 7PM PST (weekends too)
Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT. The time now is 10:32 AM.


Copyright (c) 2009 - Everlast Power Equipment